Rectangular White Porcelain Vessel Sink with Overflow and Faucet Hole NP-218155

Skip to product information
1 of 14

Rectangular White Porcelain Vessel Sink with Overflow and Faucet Hole NP-218155

Rectangular White Porcelain Vessel Sink with Overflow and Faucet Hole NP-218155

Finish Color

Type: NP-218155 – Sink Only

Finish Color

343 in stock

Regular price $195.00 USD
Regular price Sale price $195.00 USD
Sale Sold out
Quantity
Wholesale Prices
Details:
  • White glossy interior and exterior on all 4 sides
  • Rectangle porcelain vessel sink with overflow
  • Above-counter installation
  • Easy to clean, scratch-resistant, and non-porous surface
  • Overall dimensions: 19.75 x 16.5 x 5.175 inches
  • Inside sink dimension: 19.25 x 11.5 inches
  • 1.75-inch drain hole; 1.5-inch faucet hole
  • Contains overflow opening
  • Novatto pop-up drains WITH overflow options are available
  • Faucet NOT included
  • Standard plumbing connections
  • Limited Lifetime Warranty
Description:

A rectangular bathroom sink combining modern design with a classic farmhouse concept. The five-inch tall sink provides a bold countertop statement for any style or décor. The overflow provides subtle assurance that the sink will not overflow for safety reasons. A standard 1.5-inch faucet hole with overflow makes installation a breeze. A faucet is not included.

Each porcelain sink is protected with a premium glaze, giving an easy-to-clean finish for lasting beauty. A non-porous and stain-resistant porcelain ensures a look like new for years to come. Pair this with any Novatto lav faucet for a bathroom masterpiece.

Exterior dimensions measure 19.75 inches left to right by 16.5 inches front to back. The 1.75-inch drain hole is on center left to right, and is 9.25 inches on center from the back. No mounting hardware is needed. Simply adhere to the counter in the desired location. 

Additional purchase of a Novatto pop-up drain with overflow is offered: NP-218155BN-O (brushed nickel), NP-218155MB-O (matte black), and NP-218155CH-O (chrome). 

For best cleaning results, a soft cloth with mild soap and water or a non-abrasive glass cleaner is recommended.

Let your style flow and enjoy Novatto's Limited Lifetime Warranty. Supreme packaging and boxing ensure damage-free delivery. Novatto's customer service is always here to answer any additional product questions or help you choose a matching faucet at 844.404.4242 or productsupport@novatto.com.

Specs:

Spec. Sheet

Item Length (inches) 19.75
Item Width (inches) 16.5
Item Height (inches) 5.175
Item Weight 31 lb
Overflow Yes
Color White
Installation Above Counter
Faucet Hole Diameter 1.5
Drain Hole Diameter 1.75
Where To Buy:

Vessel Faucet, Brushed Nickel Vessel Faucet, Brushed Nickel

View full details